Realized commercial contracts
Name of the contract | Client |
ZoD 34/103401/2020 | P.B.I., s.r.o, Senica |
Proposal of risk assessment methodology in connection with pandemic threats in industrial enterprises falling into categories A, B in the Act of the National Council of the Slovak Republic no. 128/2015 Coll. |
|
ZoD 15/103401/2019 | Duslo, a.s. |
Elaboration of an update of the Safety Report for the company Duslo, a.s., Bratislava locality in accordance with the assignment to tender no. ON / MV / 01/2019 and CP "Security Report-Update", dated 14.03.2019 |
|
ZoD 14/103401/2019 | U. S. Steel Košice, s.r.o. |
Elaboration of explosion protection documentation O2, C2H2 in accordance with Annex No.1 |
|
ZoD 43/103401/2018 | U. S. Steel Košice, s.r.o. |
Risk analysis and assessment for the project of oxygen interconnection from ASU 5 & 6 to VP. |
|
ZoD 28/103401/2018 | U. S. Steel Košice, s.r.o. |
Technical assistance - update of the processed "Explosion protection documentation" based on the requirements of DZ Energetika. |
|
ZoD 27/103401/2018 | Ferroenergy, s.r.o. |
Technical assistance - update of the processed "Explosion protection documentation" for Ferroenergy, ltd. based on new requirements. |
|
ZoD 21/103401/2018 | Unomedical s.r.o. |
Identification of electric shock hazards for Unomedical, s.r.o. |
|
ZoD 15/103401/2016 | U. S. Steel Košice, s.r.o. |
"Analysis and assessment of Major industrial accidents risk in USSK in accordance with the requirements of new legislation" |
|
ZoD 40/103401/2015 | Ford Getrag Transmision |
Operating instructions and Explosion protection documentation |
|
ZoD 31/103401/2015 | Ford Getrag Transmision |
Analysis of documentation and elaboration of an environmental protocol for the HT Department (heat treatment) and the Technical Building. |
|
ZoD 6/103401/2014 | Transpetrol, a.s. |
Update of safety documentation in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll.as well as the requirements of Directive 2012/18 / EU (SEVESO III) in TRANSPETROL, a.s., PS1, PS2, PS3, PS4, PS5. |
|
ZoD 59/103401/2013 | Transpetrol, a.s. |
Update of safety documentation in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. as well as the requirements of Directive 2012/18 / EU (SEVESO III) in TRANSPETROL, a.s., PS1, PS2, PS3, PS4, PS5. |
|
HZ 59/2013 | Transpetrol, a.s. |
Safety report update - PS4, OSR |
|
HZ 02/2013 | U. S. Steel Košice, s.r.o. |
Training - Ensuring equipment reliability. |
|
HZ 37/2012 | Transpetrol, a.s. |
Safety Report Update - PS1 Budkovce |
|
HZ 30/2012 | U. S. Steel Košice, s.r.o. |
Development of materials for critical infrastructure risk analysis |
|
HZ 8/2012 | Whirlpool Slovakia,s.r.o. |
Creating software for Behaviour based safety |
|
HZ 25/2012 | U. S. Steel Košice, s.r.o. |
Revision of explosion protection document on DZ- Hot rolling mill |
|
HZ 2012 | U. S. Steel Košice, s.r.o. |
Creating software for the Behavior based safety project |
|
HZ 6/2012 | U. S. Steel Košice, s.r.o. |
Analysis and assessment of the extent of blast furnace gas leakage |
|
HZ 2011 | Whirlpool Slovakia,s.r.o. |
Risk analysis Stage 2 |
|
HZ 2011 | Whirlpool Slovakia,s.r.o. |
Risk analysis Stage 1 |
|
HZ 36/2011 | U. S. Steel Košice, s.r.o. |
Risk assessment in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 2011 | U. S. Steel Košice, s.r.o. |
Risk assessment - Collection of converter gas from Steelworks I. for USSK |
|
HZ 54/2011 | Transpetrol, a.s. |
Graphic materials update of of ATEX zones in accordance with the document on explosion protection for Transpetrol company |
|
HZ 26/2011 | U. S. Steel Košice, s.r.o. |
Update of Explosion protection documentation DZ - Blast furnaces |
|
HZ 23/2011 | U. S. Steel Košice, s.r.o. |
Risk assessment according to Act 261/2002 Coll. on the prevention of Major industrial accidents for the desulphurisation of raw coke oven gas |
|
HZ 22/2011 | U. S. Steel Košice, s.r.o. |
Safety Report Update U.S.Steel KE |
|
HZ 2010 | Ford Getrag Transmision |
Implementation of TPM in Ford Getrag Transmission |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Update of Explosion protection documentation DZ Energetika |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Elaboration of Explosion protection documentation for U.S.SERVIS, s.r.o |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Revision and harmonization of Explosion protection documentation DZ Koksovňa |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Elaboration of Explosion protection documentation REFRAKO, s.r.o |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Elaboration of Explosion protection documentation for LABORTEST, s.r.o |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Elaboration of Explosion protection documentation for VULKMONT, a.s |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Elaboration of Explosion protection documentation for OBAL - Servis |
|
HZ 2010 | U. S. Steel Košice, s.r.o. |
Elaboration of a proposal min. the cross-section of the pipeline for the newly designed liquid NH3 route and the proposal of safety measures |
|
HZ 70/2010 | Transpetrol, a.s. |
Update of risk analysis for explosion protection |
|
HZ 38/2010 | U. S. Steel Košice, s.r.o. |
Study of variants of the technological solution of ammonia technology in order to achieve the acceptability of social risk in the USSK |
|
HZ 108/2009 | CMF Slovakia, s.r.o |
Special consultations required for the implementation of the quality management system according to EN ISO 9001: 2008 - Engineering activities and related technical consultancy |
|
HZ 78/2009 | Transpetrol, a.s., Budkovce |
Update of the emergency plan of operation of PS1 Budkovce (Transpetrol) in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 76/2009 | Transpetrol, a.s., Budkovce |
Update of risk assessment for PS1 Budkovce plant (Transpetrol) according to the requirements of the Act on |
|
HZ 79/2009 | Transpetrol, a.s., Budkovce |
Update of documents for the protection of the population of the PS1 Budkovce plant (Transpetrol) in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 77/2009 | Transpetrol, a.s., Budkovce |
Update of the safety report of PS1 Budkovce plant (Transpetrol) in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 57/2009 | Transpetrol, a.s., Budkovce |
Study of methods and trends for measuring oil flow on the oil pipeline network |
|
HZ 54/2009 | Kybernetika s.r.o |
Residual risk assessment, analysis of technical documentation and conformity assessment for selected technological lines of the company. IEE Sensing Slovakia s.r.o |
|
HZ 31/2009 | Risk Consult,s.r.o |
|
|
HZ 33/2007 | U. S. Steel Košice, s.r.o. |
Processing of documentation for oxygen apparatus No.9. |
|
HZ 51/2008 | Slovenské elektrárne, a.s. |
Elaboration of risk analysis for the process of disassembly, repair and assembly of reactor lid accessories. |
|
HZ 19/2008 | SPP, a.s., Bratislava |
Conditions for the construction of gas pipelines for the purpose of providing building permits. |
|
HZ 42/2007 | SPP, a.s., Bratislava |
Assessment of the reliability of selected equipment based on FMEA analysis. |
|
HZ 53/2008 | U. S. Steel Košice, s.r.o. |
Risk assessment of major industrial accidents. |
|
HZ 20/2008 | U. S. Steel Košice, s.r.o. |
Proposal of technical measures to reduce the social risk to the risk acceptable for the ammonia economy facility and its related infrastructure containing HN3. |
|
HZ 28/2008 | U. S. Steel Košice, s.r.o. |
Risk assessment for expenditure plant T1000. |
|
HZ 48/2007 | Carmeuse Slovakia,s.r.o., Košice |
Coaling of rotary furnaces. Creation and elaboration of a safety program, risk assessment, elaboration of an emergency plan, elaboration of a document on explosion prevention. |
|
HZ 44/2007 | Carmeuse Slovakia,s.r.o., Košice |
Coaling of rotary furnaces Elaboration of a report on the categorization of the company in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 45/2007 | Tepláreň Košice, a.s. |
General technical diagnostics of a ball mill focused on measuring, evaluating and preparing a report on running diagnostics. If errors are found, a proposal for correction. |
|
HZ 20/2007 | U. S. Steel Košice, s.r.o. |
Evaluation of the occurrence of serious industrial accidents of the new building Galvanizing line 3 in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 8/2007 | U. S. Steel Košice, s.r.o. |
Evaluation of the occurrence of major industrial accidents of the building Oxygen apparatus No. 9 in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 78/2006 | SEZ Krompachy, a.s. |
Methods applied in quality planning and product implementation. |
|
HZ 52/2006 | U. S. Steel Košice, s.r.o. |
Expert assessment of explosion risks according to NV SR No. 493/2002 Coll. |
|
HZ 47/2006 | P.B.I., s.r.o., Senica |
Safety and reliability management conditions based on the identification and assessment of risk factors. |
|
HZ 30/2006 | SPP, a.s., Bratislava |
Safety and reliability management conditions based on the identification and assessment of risk factors. |
|
HZ 38/2006 | Pivovary Topvar, a.s., Topoľčany |
Elaboration of Explosion protection documentation according to NV SR No. 493/2002 Coll. |
|
HZ 28/2006 | CORINEXGROUP, a.s., Bratislava |
Elaboration of chapters within the project "Analysis of the possibilities of monitoring the integrity of the pipeline in the conditions of the SPP of the Transit division. |
|
HZ 15/2006 | Interport Servis,s.r.o., Košice |
Categorization for magnesium storage in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 14/2006 | U. S. Steel Košice, s.r.o. |
Expert assessment of explosion risks according to NV SR No. 493/2002 Coll. |
|
HZ 12/2006 | KYBERNETIKA, s.r.o., Košice |
Development of an algorithm for deciding whether the assessed area is risky or non-risky. |
|
HZ 5/2006 | P.B.I., s.r.o, Senica |
Processing of data analysis for solving the problem of elaboration explosion protection documentation according to STN EN 60079-10, STN EN 60079-20. |
|
HZ 69/2005 | MOLEX Slovakia,s.r.o., Košice |
Categorization and preliminary risk assessment for Molex Slovakia, s.r.o. in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 20/2005 | SPP, a.s., Bratislava |
Integrity management conditions based on the identification and evaluation of risk factors in SPP, a.s. |
|
HZ 16/2005 | NDS, a.s., Branisko |
Creation of the organizational and management system of the Branisko Tunnel operation. |
|
HZ 15/2005 | NDS, a.s., Branisko |
Performing an analysis of the current state of operation of the Branisko Tunnel. |
|
HZ 11/2005 | SPP, a.s., Bratislava |
Statistical evaluation of diagnostic measurements in order to improve maintenance while taking into account risk factors in operation. |
|
HZ 5/2005 | P.B.I., s.r.o, Senica |
Advisory and consulting activities in the preparation of risk assessment in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 40/2004 | U. S. Steel Košice, s.r.o. |
Risk assessment and preparation of documents in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 21/2004 | EVO, a.s., Vojany |
Risk assessment in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 20/2004 | U. S. Steel Košice, s.r.o. |
Assessment of the impact of the new dynamoline line No. 3 in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 12/2004 | U. S. Steel Košice, s.r.o. |
|
|
HZ 1/2004 | P.B.I., s.r.o, Senica |
|
|
HZ 36/2003 | Vegum, a.s., Vestenice |
Preparation of safety audit in accordance with the requirements of the OHSAS 18 001 standard. |
|
HZ 32/2003 | EVO, a.s., Vojany |
Elaboration of a security program in according to the requirements of the Act on Prevention of Major industrial accidents No. 261/2002 Coll. |
|
HZ 13/2003 | Vihorlat, s.r.o., Snina |
Elaboration of a preliminary design of an ergonomic crane cab. |
|
HZ 17/2003 | Mecom, a.s., Humenné |
Preparation of preliminary risk assessment |
|
HZ 31/2002 | BSH DRIVES and PUMPS, s.r.o., Michalovce |
Elaboration of safety audit for BSH DRIVES and PUMPS, s.r.o .. |
|
HZ 26/2001 | Chemko, a.s., Stražske |
Elaboration of an emergency plan and elaboration of a risk assessment based on SEVESO II. |
|
HZ 4/2001 | Chemosvit, a.s., Svit |
Elaboration of a Pilot project for a comprehensive safety management system within integrated approaches based on the ISO 18 001-02 proposal. |